HomeApache Geronimo Project Management > Documentation > Apache Geronimo Release Status > Geronimo 2.1.7 Release Status --Done

Geronimo 2.1.7 Release Plan/Status

1 Basic infomation:

Release Manager: Rex Wang
SVN Branch: https://svn.apache.org/repos/asf/geronimo/server/branches/2.1
SVN Tag: htps://svn.apache.org/repos/asf/geronimo/server/tags/geronimo-2.1.7
Code Freeze date: 11/15/2010  11/19/2010
Release Candidate:  11/16/2010  11/20/2010(RC I) 11/24/2010(RC II)
Proposed Announce date: 11/30/2010
Download URL: http://geronimo.apache.org/downloads.html


2 Planned Items:

2.1 Components update:

Reference Description Status
geronimo-javamail_1.4_mail 1.7 -> 1.8.2
OpenEJB 3.0.2 -> 3.0.3
txmanager 1.4 -> 2.2.1
tomcat 6.0.26 - > 6.0.29
tranql (and its vendors)
-> 1.7
wadi
2.0 -> 2.1.2


2.2 Required Items:

Reference Person Description Status
Samples Forrest Ensure 2.1 Samples can run on 2.1.7 (via alias entries)  
Update release notes RM Add in resolved issues and known issues into release notes  
Update README.txt RM   
TCK Shawn   

2.3 Optional Items:

Reference Person Description Status
    
    


3 JIRAs

3.1 Unresolved JIRAs to be included into 2.1.7 – auto query from JIRA system.

jiraissues: Unable to determine if sort should be enabled.

3.2 Included JIRAs – auto query from JIRA system.

jiraissues: Unable to determine if sort should be enabled.